this method was embodied to the tasks implemented by the business since our 1st separate actions

this method was embodied to the tasks implemented by the business since our 1st separate actions

The Lazarevsky Bridge throughout the Small Nevka River sticks out because of its distinctive and expressive design developed in 2000 – 2009 (with a few breaks) for the connection reconstruction. In reality, the old numerous period beam connection happens to be reconstructed into a contemporary cable-stayed connection with powerful as well as the same time frame extremely exquisite outlines. As a result of that the renovated Lazarevsky Bridge happens to be over and over utilized as being a model when films that are shooting.

Construction of the bridge that is new the Ob River in Novosibirsk (positioned during the positioning of Olovozavodskaya Street) is one of remarkable present task associated with business. The connection comprises an arch river period (a tied up arch with likely suspenders, so named “network arch”) 380 m long, which will be an archive value both for Russia as well as European countries. Aesthetically, the 70-m high arch resembles a gigantic red bow this is certainly among the Siberian symbols represented when you look at the coating of hands of Novosibirsk.

Participation into the task for reconstruction associated with M-4 Don Federal path can be a milestone that is important the company’s life.

Comparison analysis of Russian and road that is german codes had been carried call at 2010-2011 when making the street cost area from KM933 to KM1024. The task happens to be implemented in cooperation having A german business beb at the effort and help associated with customer, Russian Ministry of Transport and State Company AVTODOR.Continue reading